Log in to the online community

Want to post a reply? You'll need to log in
Calibration of Electricity meters, Low Voltage Transformers , Current Trans formers, Plus High Voltage VTs &CTs) Low Vot
Question
Require a contractor that is able to  carry out calibration of  
  1. Low voltage 3 phase electricity/energy meters  and  Current Transformers in  a low voltage system
  2. Current  Transformers , and Voltage transformers  in a high voltage system.
In short  require calibration of metering systems  to meet  Standard required for Capacity Market . 
Metering system already in place ,calibration required.

Share:

Log in

Want to post a reply? You'll need to log in