Hi All
I've got an industrial electric water heater in which I have just replaced the 66 elements and filled it up with water. The heater manufacturer says I should pressure test it to 7.5 bar before commissioning, but the tank is vented to atmosphere. So I can't do this. The elements are sealed with compression fittings and olives set to manufacturer's torque spec of 140 NM. it seems to me that if I don't do the pressure test there is a risk of a leak developing later, but I don't know what the probability is.
Any ideas?
Stephen